Salt River Project electricity rates
Salt River Project charges an average of 13.46 cents per kilowatt-hour to residential customers, and the average household on its system paid $163 a month using 1,211 kilowatt-hours, according to its 2024 filing with the U.S. Energy Information Administration.
Public power district SRP Arizona
Where Salt River Project sits
It serves 1.1 million residential customers, making it one of the larger utilities in Arizona. Its 13.46¢ per kilowatt-hour sits 11.6% below the Arizona average of 15.23¢.
Consumption here is high, 1,211 kilowatt-hours a month against a national average of 871. Long cooling seasons, large detached homes and electric resistance heating are the usual causes, and together they matter more to the bill than the rate does.
A public body created by the state or county, governed by an elected or appointed board rather than by shareholders. That matters because a bill is not only the cost of generating electricity: it also carries the cost of the network, and who owns that network changes how it is paid for.
| Rate | Monthly bill | Monthly kWh | |
|---|---|---|---|
| Salt River Project | 13.46¢ | $163 | 1,211 |
| Arizona average | 15.23¢ | $160 | 1,041 |
| United States average | 18.44¢ | $155 | 871 |
Utility figures: U.S. Energy Information Administration, Form EIA-861 annual electric power industry report, 2024. State and national figures: Electric Power Monthly, May 2026. Methodology
Where Salt River Project delivers
Its service territory covers 3 Arizona counties, either wholly or in part. Utility boundaries follow historic franchise agreements rather than county lines, so a county appearing here does not mean every address in it is served by Salt River Project.
- Gila
- Maricopa
- Pinal
How often the power goes out
In 2024 the average Salt River Project customer went 58 minutes without electricity across 0.95 interruptions. The median across the 941 utilities that report this is 185 minutes.
That is markedly better than typical. Short outage durations usually mean an underground or heavily automated network, and they are expensive to achieve, which is part of why reliable systems often carry higher delivery charges.
Optional rate plans
Salt River Project offers time-of-use pricing to residential customers. 360,794 households were enrolled, about 34.3% of its residential base.
These plans are opt-in almost everywhere. They reward households that can move laundry, dishwashing, water heating or electric vehicle charging out of the late-afternoon peak, and they cost more than the standard rate for households that cannot. How to tell which group you are in.
Rooftop solar on this system
59,735 residential customers had net-metered solar in 2024, totalling 393.22 megawatts. That works out to 56.7 installations per thousand customers, against a median of 8 across the utilities reporting it.
Adoption here is exceptionally high. That usually means some combination of a high retail rate worth displacing, strong sunshine and favourable export rules, and it tends to bring its own regulatory argument about who covers the fixed cost of the network. What exports are actually worth.
Other Arizona utilities
| Utility | Rate | Bill | Customers |
|---|---|---|---|
| Arizona Public Service Co | 16.45¢ | $170 | 1.3 million |
| Tucson Electric Power Co | 15.63¢ | $125 | 412,747 |
| UNS Electric, Inc | 16.02¢ | $148 | 95,191 |
| Trico Electric Cooperative Inc | 14.17¢ | $133 | 52,450 |
| Sulphur Springs Valley E C Inc | 13.49¢ | $100 | 46,008 |
Salt River Project rates: common questions
How much does Salt River Project charge per kilowatt-hour?
An average of 13.46 cents per kilowatt-hour across its residential customers in 2024. That is -11.6% against the Arizona average of 15.23¢ and -27.0% against the national average of 18.44¢. It is an all-in average across every residential rate schedule the utility offers, not a specific tariff.
What is the average Salt River Project bill?
$163 a month, based on total residential revenue divided by residential customers over the 2024 survey year, at an average of 1,211 kWh a month. The national average bill is $155 at 871 kWh.
Who owns Salt River Project?
It is classified by the EIA as a public power district. A public body created by the state or county, governed by an elected or appointed board rather than by shareholders.
Is Salt River Project expensive compared with other Arizona utilities?
It ranks #14 of the 22 Arizona utilities covered here, counting from the most expensive. Nationally it ranks #676 of 1369.